Project Plan

Project Plan

Filter

    BEE THE DIFFERENCE

    HIVE CITY

    • Business Hub & Local Lifestyle Center 

    What the BUZZ is about 

    Total Project Cost

    • $11,000,000.00 CAD

    Building Acquisition 

    • $6,000,000.00
      • [ $11,000,000.00 - $6,000,000.00 ] = $5,000,000.00 Remaining 

    LEGAL DESCRIPTION

    • Plan 7820954,
    • Block 1,
    • Lot 5A

     
    Site Size: ± 2.32 Acres
    Zoning: Medium Industrial (IM)
    Office Area: 17,700 SF
    Warehouse Area: 22,300 SF
    Loading: 4 - Dock, 1 - Dock to Grade, 1 - Grade

    Property Type

    • Industrial

    JOIN US

    The opportunity to BEE-COME part of this free-standing building consisting of ±40,000 SF of fully renovated showroom, office and warehouse space. The showroom and office area consists of ±17,700 SF of space and features unique and modern upgrades with an abundance of natural light. The warehouse offers ±22,300 SF of space and comes complete with dock and grade loading.

    Highlights

    • Free-standing, LEED Gold building
    • Recent renovations provide unique and modern upgrades
    • Positioned on a fully paved 2.32 acre site with parking available
    • Located in Northwest Edmonton adjacent to green spaces

    Building Specification 

    • Heating Forced air with air conditioning
    • Lighting LED, T5, T8, and metal halide
    • Clear Height 14’
    • Clear Loading

    IM Zoning

    [ LEARN MORE ] - 420 (IM) Medium Industrial Zone

    IB Zoning Change

    We have been 100% Successful with every zoning application we have done for all our past projects and buildings.  This Zoning change will allow us to conduct a variety of business venture and open our space to additional opportunities.  The surrounding and neighboring building have IB zoning as well so this zoning application should not be a problem with the right documentation that believe we can provide.  

    Estimated Cost $25,000 

    [ LEARN MORE ] - 400 (IB) Industrial Business Zone

    Lease Rates

    • Lease Rate $12.00 P / SF
    • Op Cost Estimated $5 Per / SF

    DEVELOPMENT COST

    $1,500,00.00

    • [ $5,000,000.00 - $1,500,00.00 ] = $3,500,000.00 Remaining   
      • Leasehold Improvement 
      • Equipment 
      • Supplies 

    Additional Structure

    $1,500,000.00 

     [ $3,500,000.00 - $1,500,00.00 ] = $2,000,000.00 Remaining 








    80% Investor 20% Us Split on building

    • Until Original Investment Repaid then becomes 50% | 50% Split 
    • Hive Holdings 50 / 50 Split 
      • All Project Investment
        •  

     

     

     $200,000,000.00

     

    Hive Holdings 

    - M.int Beauty Investment = $350,000.00 = 35% Equity 

    - UniQ Beaute Investment = $200,000.00 = 40% Equity 

    - 1001 Nights Investment = $150,000.00 = 35% Equity 

    - BEE-Linked 100,000

    - Hive Fit 300,000

    • Fitness Equipment 
    • Matts
    • Epoxy Floor

    All Tanning Whole Sale = $100,000 = 33% Equity 

    • Hive Fit Sublease $500
    • OCD Logistics Lease 1X 960 Sf Mezz  $1000
    • Inventory 
    • Tanning Bed 

    - Hospitality 250,000

    - OCD Logistics Investment = $100,000.00 = 25% Equity

    • U-Haul Retail $10,000
    • Racking Shelves
    • 4X 40X8 Sea Cans
    • 3X 40X8 Reffer Sea Cans 
    • Electrical $15,000
    • Racking $20,000 Reference Container Plan 

    - Pure Leafology Investment = $100,000 = 50% Equity

    Wheat Grass | Micro Green | Vegetables 

    • 8X 20X8 Sea Cans
    • 1X 40 X8 Sea Can
    • Seeds
    • Lights 
    • Electrical 
    • HVAC
    • Shelves 
    19 products
    Sold Out
    Sold Out
    Sold Out
    Sold Out
    Sold Out
    Sold Out